Center Parcs Elvedon
Architect: Holder Mathias Architects
Installer: Geschwender
Product: Lockers, Cubicles, and Vanity Units
Installation is progressing fast on site at Centre Parcs in Suffolk, Geschwender Installers are working section by section through the changing village to minimise long-term disruption and closures at the Subtropical Swimming Paradise.
In the last month more of the 200 new Geschwender changing cubicles have been installed to male, female, family, and disabled changing areas. In addition to toilet and shower cubicles and duct walling in these areas.
Over 1000 new lockers are also on site with the first bays already installed in areas where the ceilings and signature heated flooring already in place.
LSA, Geschwender, and Center Parcs are on track for the planned complete re-opening of the changing village in Spring 2023.